
Projects


Eclipse Tower Parramatta
Level 9 Refit
Client: Scope
Full refurbishment project from demolition to completion including electrical, data, and lighting.

NSW Department of Education
WiFi Rollout
Client: NSW Education ICT
Rollout of wireless access points at:
-
Corrimal Public School
-
Lindsay Park Public School
-
Port Kembla Public School
-
Nareena Hills Public School
-
Otford Public School
-
Bulli Public School
-
Woonona East Public School
-
Thirroul Public School
-
Waniora Public School
-
Bellambi Public School
-
Berkley West Public School



Woonona Public School
AV/Communications
Client: NSW Education ICT
-
Wireless access point installation
-
Upgrade of Data network infrastructure ( Cat 6 Data outlets throughout the school)
-
Complete Installation of new LED touch screen interactive white boards (including associated Data and Power outlets).

Warrawong High School
Communications
Client: NSW Education ICT
-
Fully integrated CCTV system
-
Wireless access point installation
-
Upgrade of Data network infrastructure ( Cat 6 Data outlets throughout the school)



Lake Heights Public School
Communications
Client: NSW Education ICT
-
Fully integrated CCTV system
-
Upgrade of Data network infrastructure (building Distributors and Fiber uplinks between).

Albion Park High School
Electrical/Communications
Client: NSW Education ICT
-
Resource Kiosk in the Library including the Power and Data.
-
Fully integrated PA system with automatic bell timer and wide area wireless microphone.
-
Fiber upgrade of Data network infrastructure (building Distributors and uplinks between).



Westfields
Wayfinding Kiosks
Client: Abuzz
Mirkom assisted with installation of wayfinding kiosk stations in Westfields Shopping Centres across Sydney, inlcuding all of kiosks within Westfield Penrith.

Woollahra Hotel
Hotel Area Renovation
Client: Calida



Storage Kings
Renovation - Multiple Sites
Client: Cooper
Working with Cooper, Mirkom helped to complete a full renovation of the customer service area inside Storage Kings Balmain, Woolloomooloo, and Castle Hill locations. Mirkom provided all electrical, data, lighting, and NBN services.

Nettleton Tribe Artamon
Renovation
Client: Akalan
Mirkom completed installation of all new lighting, power, automation and Cat6A data system as part of this project.



Westpac
Blacktown Branch
Client: Westpac

Heathcote Nursing Home
New Building
Client: Grindley
Construction of new building extending the nursing home. Mirkom handled all data and nurse call installation



Suncorp iCare
Pyrmont and Wollongong
Client: Built
2x Office fitouts inclsive of all:
Cat6A Data
Lights
Power
WiFi

Huawei
Sydney Office
Client: Huawei
Complete electrical/data/voice installation completed in a short 4 weeks



Telstra
Sydney Head Office
Client: Telstra
10 floor large scale installation of 400x cat6a outlets, WiFi rollout, and a completely new style of AV system - the first install of this system type in Australia
Completed in 40 weeks.

Westpac
Narellan Branch
Client: Built
Size: 300sqm
Complete replacement of entire electrical and data/voice installation in a very short 4 weeks.



Oxford Towers
Woollongong CBD
Client: Oxford Towers
2x 15 storey towers consisting of MATV/PATV rollout, fibre works, WiFi installation, and over 1400x Cat6 outlets.
Plus an upgrade of old OM1 infrastructure.
All done in a very short 52 weeks.

Rabo Bank
Sydney CBD
Client: Graphite
Size: 1000sqm
200x new Cat6a
New fibre backbone
Rollout of new IP based AV system
Completed in a tight 8 weeks



USYD
6 Building Re-Wire Package
Client: University Of Sydney
A complete communications reqire of Cat6a, inlucding new pathways, new fibre and new comms rooms of:
-
Storie Dixon Building
-
88 Mallet Street
-
Heydon Lawrence Building
-
Holme Building
-
Badham Building
-
McMaster Building

Taronga Zoo
New Office Space
Client: Graphite
Size: 3000sqm
A project consisting of over 200 cat6 outlets, a new communications backbone, and an upgrade of the existing OM1 fibre infrastructure to OM3. This project was completed in a tight 12 week timeframe.



Burberry
Flagship Sydney Store
Client: Burberry
Size: 2500sqm
Mirkom completed a design and construction of all new comms room to house a new AV system, a fibre backbone, voice PABX system, and a WiFi rollout, all while working within the restrictions of being in a heritage building.

Merrylands High School
New Administration Building
Client: Patterons Building Group
Construction of a completely new administration building including all electrical and data within, as well as all supporting civil works outside too



Australian Museum
Westpac Long Gallery
Client: AJ Bristow
A once in a lifetime unique project, The westpac long gallery has many different features from track lighting, to interior lighting in display cases, accent lighting on heritage features, spotlights for displays and an RGB 'sky-light', this project had it all.
Mirkom was responsible for all electrical, lighting, and data on this project

Ferrari Maserati
Waterloo Showroom
Client: Ultra Building Co
Designed to showcase some of the most stunning vehicles created, the all new Ferrari Maserati dealership in Sydney, Australia, utilizes the latest energy management and water saving techniques to achieve a five-star energy rating. Ferrari needed an automation system that could centralize A/V management and complement both the $20 million building and the cars.



Mission Australia
Triple Care Farm
Client: Pattersons Building Group
This project was carried out successfully, on time and on budget for our client Pattersons. Mirkom Group carried out the fire, electrical and lighting works for this project.

University Of Wollongong
Ongoing
Client: UOW
WAP Installations over the past 16 years. These are won through various builders all via hard dollar tenders and direct work



UNSW
Ongoing
Client: UNSW
Electrical and TE/Comms Scope Data / Voice / Fibre WAP Installations over the past 22 years. These are won through various builders all via hard dollar tenders and direct work

UNSW
Morven Brown Study Space
Client: Formula Interiors
Mirkom, working together with Formula and UNSW, recently completed a renovation of the group floor student study space in Morven Brown. Completed in a tight 12 week timeline, Mirkom was responsible for all lighting, electrical, and data on this project.



UNSW
Goodsell Building Ground Floor
Client: Formula Interiors
Mirkom, working together with Formula and UNSW,
An entire demolition and rebuild of an entire level, this project was an exciting challenge and completed in record time. Mirkom was responsible for all lighting, electrical, and data on this project.

UNSW
External Signage
Client: Intrec
Mirkom, working together with Intrec and UNSW, recently installed many lit directional signs and gate signs across the Kensington and Paddington campus.
