top of page
imageedit_24_6640102951.jpg

Projects

eclipse tower
L9_edited.jpg

Eclipse Tower Parramatta

Level 9 Refit

Client: Scope

Full refurbishment project from demolition to completion including electrical, data, and lighting.

nsw gov black.jpg

NSW Department of Education

WiFi Rollout

Client: NSW Education ICT

Rollout of wireless access points at:

  • Corrimal Public School

  • Lindsay Park Public School

  • Port Kembla Public School

  • Nareena Hills Public School

  • Otford Public School

  • Bulli Public School

  • Woonona East Public School

  • Thirroul Public School

  • Waniora Public School

  • Bellambi Public School

  • Berkley West Public School

NSW_Education_logo_long.png
woonona public school.png
woonona logo.png

Woonona Public School

AV/Communications

Client: NSW Education ICT

  • Wireless access point installation

  • Upgrade of Data network infrastructure ( Cat 6 Data outlets throughout the school)

  • Complete Installation of new LED touch screen interactive white boards (including associated Data and Power outlets).

warrawong.jpg

Warrawong High School

Communications

Client: NSW Education ICT

  • Fully integrated CCTV system

  • Wireless access point installation

  • Upgrade of Data network infrastructure ( Cat 6 Data outlets throughout the school)

warrawong logo.png
lake heights.jpg
lake heights logo.png

Lake Heights Public School

Communications

Client: NSW Education ICT

  • Fully integrated CCTV system

  • Upgrade of Data network infrastructure (building Distributors and Fiber uplinks between).

albion park hs.jpg

Albion Park High School

Electrical/Communications

Client: NSW Education ICT

  • Resource Kiosk in the Library including the Power and Data.

  • Fully integrated PA system with automatic bell timer and wide area wireless microphone.

  • Fiber upgrade of Data network infrastructure (building Distributors and uplinks between).

albion park hs logo.png
abuzz
abuzz

Westfields

Wayfinding Kiosks

Client: Abuzz

Mirkom assisted with installation of wayfinding kiosk stations in Westfields Shopping Centres across Sydney, inlcuding all of kiosks within Westfield Penrith.

hotel pano

Woollahra Hotel

Hotel Area Renovation

Client: Calida

hotel
sk balmain.jpg
sk balmain.jpg

Storage Kings

Renovation - Multiple Sites

Client: Cooper

Working with Cooper, Mirkom helped to complete a full renovation of the customer service area inside Storage Kings Balmain, Woolloomooloo, and Castle Hill locations. Mirkom provided all electrical, data, lighting, and NBN services.

nettletontribe

Nettleton Tribe Artamon

Renovation

Client: Akalan

Mirkom completed installation of all new lighting, power, automation and Cat6A data system as part of this project.

nettletontribe
westpac blacktown
westpac blacktown

Westpac

Blacktown Branch

Client: Westpac

heathcote

Heathcote Nursing Home

New Building

Client: Grindley

Construction of new building extending the nursing home. Mirkom handled all data and nurse call installation

heathcote
Suncorp-v2.png
Suncorp-v2.png

Suncorp iCare

Pyrmont and Wollongong

Client: Built

2x Office fitouts inclsive of all:

Cat6A Data

Lights

Power

WiFi

huawei

Huawei

Sydney Office

Client: Huawei

Complete electrical/data/voice installation completed in a short 4 weeks

huawei
telstra head office.jpg
telstra head office.jpg

Telstra

Sydney Head Office

Client: Telstra

10 floor large scale installation of 400x cat6a outlets, WiFi rollout, and a completely new style of AV system - the first install of this system type in Australia

Completed in 40 weeks.

westpac narellan.jpg

Westpac

Narellan Branch

Client: Built

Size: 300sqm

Complete replacement of entire electrical and data/voice installation in a very short 4 weeks.

westpac narellan.jpg
oxford towers.jpg

Oxford Towers

Woollongong CBD

Client: Oxford Towers

2x 15 storey towers consisting of MATV/PATV rollout, fibre works, WiFi installation, and over 1400x Cat6 outlets.

Plus an upgrade of old OM1 infrastructure.

All done in a very short 52 weeks.

rabo bank.jpg

Rabo Bank

Sydney CBD

Client: Graphite

Size: 1000sqm

200x new Cat6a

New fibre backbone

Rollout of new IP based AV system

Completed in a tight 8 weeks

rabo bank.jpg
sydlogo.png

USYD

6 Building Re-Wire Package

Client: University Of Sydney

A complete communications reqire of Cat6a, inlucding new pathways, new fibre and new comms rooms of:

  • Storie Dixon Building

  • 88 Mallet Street

  • Heydon Lawrence Building

  • Holme Building

  • Badham Building

  • McMaster Building

taronga zoo.jpg

Taronga Zoo

New Office Space

Client: Graphite

Size: 3000sqm

A project consisting of over 200 cat6 outlets, a new communications backbone, and an upgrade of the existing OM1 fibre infrastructure to OM3. This project was completed in a tight 12 week timeframe.

taronga zoo.jpg
burberry.jpg
burberry.jpg

Burberry

Flagship Sydney Store

Client: Burberry

Size: 2500sqm

Mirkom completed a design and construction of all new comms room to house a new AV system, a fibre backbone, voice PABX system, and a WiFi rollout, all while working within the restrictions of being in a heritage building.

merrylands.jpg

Merrylands High School

New Administration Building

Client: Patterons Building Group

Construction of a completely new administration building including all electrical and data within, as well as all supporting civil works outside too

merrylands.jpg
DSC_4671.jpg
DSC_4671.jpg

Australian Museum

Westpac Long Gallery

Client: AJ Bristow

A once in a lifetime unique project, The westpac long gallery has many different features from track lighting, to interior lighting in display cases, accent lighting on heritage features, spotlights for displays and an RGB 'sky-light', this project had it all.

Mirkom was responsible for all electrical, lighting, and data on this project

ferrari.jpg

Ferrari Maserati

Waterloo Showroom

Client: Ultra Building Co

Designed to showcase some of the most stunning vehicles created, the all new Ferrari Maserati dealership in Sydney, Australia, utilizes the latest energy management and water saving techniques to achieve a five-star energy rating. Ferrari needed an automation system that could centralize A/V management and complement both the $20 million building and the cars.

ferrari.jpg
care-farm.jpg
care-farm.jpg

Mission Australia

Triple Care Farm

Client: Pattersons Building Group

This project was carried out successfully, on time and on budget for our client Pattersons. Mirkom Group carried out the fire, electrical and lighting works for this project.

wollongong uni logo.png

University Of Wollongong

Ongoing

Client: UOW

WAP Installations over the past 16 years. These are won through various builders all via hard dollar tenders and direct work

wollongong uni logo.png
channels4_profile.jpg
channels4_profile.jpg

UNSW

Ongoing

Client: UNSW

Electrical and TE/Comms Scope Data / Voice / Fibre WAP Installations over the past 22 years. These are won through various builders all via hard dollar tenders and direct work

imageedit_24_6640102951.jpg

UNSW

Morven Brown Study Space

Client: Formula Interiors

Mirkom, working together with Formula and UNSW, recently completed a renovation of the group floor student study space in Morven Brown. Completed in a tight 12 week timeline, Mirkom was responsible for all lighting, electrical, and data on this project.

UNSW-C20-Morven-Brown-Student-Led-Learning-Formula-Interiors.jpg
IMG-5313.JPG
UNSW-F20-Goodsell-Building-Formula-Interiors-Fitout-1.jpg

UNSW

Goodsell Building Ground Floor

Client: Formula Interiors

Mirkom, working together with Formula and UNSW,

An entire demolition and rebuild of an entire level, this project was an exciting challenge and completed in record time. Mirkom was responsible for all lighting, electrical, and data on this project.

IMG_9738c.jpg

UNSW

External Signage

Client: Intrec

Mirkom, working together with Intrec and UNSW, recently installed many lit directional signs and gate signs across the Kensington and Paddington campus.

cofa-sign
bottom of page